Response 718742295

Back to Response listing

About you

A. What is your name?

Name (Required)
Mr Timothy Hoad

C. Where do you live?

Please select one item
(Required)
East of England
East Midlands
West Midlands
North East
North West
Northern Ireland
Scotland
Ticked South East
South West
Wales
Yorkshire and the Humber

D. Are you answering this consultation as:

Please select one item
(Required)
Ticked Resident affected by aviation
Airline passenger
Member of the General Aviation community
Member of the commercial aviation industry
Military
Government and / or other regulators
Representative or national organisation or institute
Elected political representative

E. Are you affiliated with any organisation?

Please select one item
Yes
Ticked No

G. Do you consent for your response to be published?

Please select one item
(Required)
Ticked Yes, with personal identifying information (name, location, respondent category, organisation, additional information - please note your email address will NOT be published if you choose this option)
Yes, anonymised
No

General observations

1. Considering the draft guidance overall, to what extent does it meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
How would you improve?
The starting point should be the description of the operation of the "original noise corridors" - the preferred noise routes. There has never, to my knowledge, been any consultation regarding changes to these routes - yet planes are deviating away from the central line for routes. Planes should be sticking to these routes and I would expect that 80% of planes should be within the central 300 m of corridors which are 1500 m wide with equal distribution of everything else either side of the central 300 m.
General observations
Allowing planes to sue satellite navigation systems to improve efficiency and cut costs should not mean that planes are allowed to fly anywhere within the 1500 m corridor. DOING this means that corridors are enlarged and this has never been approved by the Department of Transport - no consultation with residents has taken place. A plane on the edge of the 1500 m corridor has the same noise effect to houses 1500 m away from the central line HAS the same noise effect as it would have on a house only 750 m away from the central line IF the plane kept to the central line. In effect allowing planes to fly at the edge of noise corridors widens the noise corridor from 1500 m to 3000 m and this has never been consulted on or approved by residents who are now suffering from a huge increase in noise from planes flying directly overhead instead of a mile away.

Tier 1a: Stages 1 to 7

2. Considering Stage 1 (Define) of the process , to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
How to improve
Satellite navigation should keep planes to the centre of preferred noise routes. Moving the nuisance away from the centre of noise corridors has never been approved and no compensation has ever been offered for damage done to quality of life or property values. When first married I lived in Isleworth pretty well under the flight path, We could afford the property because the price was much lower than it would have been if it were not under the flight path.

3. Considering Stage 2 (Develop and assess) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
How to improve
The consultation should start with an explanation of WHY PLANES ARE DEVIATING FROM THE MIDDLE OF NOISE CORRIDORS and explaining who authorised such changes and when and what consultations were made or what compensation was offered - None and None

4. Considering Stage 3 (Consult) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
How to improve
Wrong starting point

5. Considering Stage 4 (Update and submit) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
How to improve
Wrong starting point

6. Considering Stage 5 (Decide) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
How to improve
Wrong starting point

7. Considering Stage 6 (Implement) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
How to improve
Wrong starting point Effect of any changes due to additional runway also need to use the original noise corridors as the starting point

8. Considering Stage 7 (Post-implementation review) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
How to improve
Wrong starting point

Tier 1a: Evidence of engagement

9. At certain stages in the process (starting with the development of design principles at Step 1b) the CAA will look for evidence of a two-way conversation to see that the sponsor has adequately engaged stakeholders. In paragraph C9 the CAA describes the evidence that we will look for as "detail of what sponsors have been told by their audiences; how they responded to this feedback; and how it has affected the proposals they are bringing forward".    Has the CAA adequately detailed what we would expect to see to know that a two-way conversation has taken place?

Please select one item
Yes
Ticked No
Don't know
What else to show two way conversation?
The original description of location and operation of the original noise corridors

Tier 1a:Third-party facilitation

10. At various points in the process (starting with the development of design principles at Step 1b) the CAA suggests that voluntary use of a third-party facilitator could be useful. Should the CAA be more prescriptive as to how and when a facilitator could be used?

Please select one item
Yes
Ticked No
Don't know

Tier 1a: Categorisation of responses

12. In paragraphs 177 and C34-C36, and Table C2, we discuss the categorisation of consultation responses. The sponsor is required to sort consultation responses into two categories: i) those responses that have the potential to impact on the proposal because they include new information or ideas that the sponsor believes could lead to an adaptation in a lead design option or a new design option, and ii) those that do not. Is the CAA's explanation of the categorisation exercise and description of the categories sufficient?

Please select one item
Yes
Ticked No
Don't know
Categorisation - additional detail
It should be clear that only the Department of Transport can alter the way in which noise corridors - Preferred noise routes can be used. Changing the tracks that planes use away from the centre of originally approved noise corridors violates the airspace of communities which now have planed flying directly overhead by deviating from the central routes covered by the Department of Transports originally approved noise corridors

Tier 1a: Options appraisal

13. In paragraph E25 and E34 the CAA states that methodologies for the various aspects of the options appraisal should be agreed between the CAA and the sponsor at an early stage in the process, on a case-by-case basis. This provides flexibility for different local circumstances. Does this approach strike the right balance between proportionality and consistency?

Please select one item
Yes
Ticked No
Don't know
OA - explain re proportionality
the CAA and all other bodies dealing with aircraft flight paths should be instructed by the Department of Transport and not given licence to change the flight paths of planes using satellite navigation or anything else. If planes are looking to reduce costs or improve efficiency by changing flight paths to over new communities then WHO pays for the nuisance imposed? No new road, canal or rail link would be built without compensation for communities affected - so why should flight paths be any different?

Tier 1a: Safety information

14. At each stage in the airspace change process that an options appraisal takes place, the sponsor will be required to submit a safety assessment. The sponsor will be required to provide a plain English summary of the safety assessment and the CAA will provide a plain English summary of its review (i.e. of the Letter of Acceptance, which forms the CAA’s review of the safety assessment) when it makes a decision. These documents will be available on the portal.   Do you have any views on specific information that should be included and/or excluded from the plain English summary of the sponsor’s safety assessment and the CAA’s review? 

Safety assessment
No. But clearly in an emergency planes could be flown outside noise corridors.

Tier 1b: Temporary airspace changes

15. Considering Tier 1b changes, to what extent does the draft guidance on temporary airspace changes meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
How to improve
No changes to the ORIGINALLY APPROVED NOISE CORRIDORS have been authorised by the Department of Transport - of if they have then such approval has been hidden from communities who have had increased noise resulting from such changes

Tier 1c: Operational airspace trials

16. Considering Tier 1c changes, to what extent does the draft guidance on operational airspace trials meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
How to improve
The trials should be all about KEEPING PLANES on track - i.e to the centre of the original noise corridors.

Tier 1: Spaceflights

17. On 21 February 2017 the Government published the Draft Spaceflight Bill. As the foreword to the draft Bill sets out, “This legislation will see the Department for Transport and the Department for Business, Energy and Industrial Strategy, the UK Space Agency, the Civil Aviation Authority and the Health and Safety Executive working together to regulate and oversee commercial spaceflight operations in the UK.” Do you have any views on whether this process could be used or adapted to suit future airspace change proposals to enable spaceflights, as anticipated in the Draft Spaceflight Bill?

Spaceflight
No

Tier 2: Permanent and planned redistribution

18. The Government proposals talk about a Tier 2 change as one which is likely to alter traffic patterns below 7,000 feet over a populated area and which therefore could have a potential noise impact for those on the ground. The key requirement is that the air navigation service provider must demonstrate that it has assessed the noise impact of the proposed change and engaged with affected communities as appropriate. Which stages of the Tier 1a airspace change process do you think are necessary for a proposal categorised as a Tier 2 change? Please select all those which apply:

Please select all that apply
Ticked Stage 1 Define
Ticked Stage 2 Develop and assess
Ticked Stage 3 Consult
Ticked Stage 4 Update and submit
Ticked Stage 5 Decide
Ticked Stage 6 Implement
Ticked Stage 7 Post-implementation review
None of these
Don’t know
Tier 2 reasons
AND the starting point IS NOT the current set of flight path tracks BECAUSE these already represent a deviation away from what was originally approved by The Department of Transport. If the Department of Transport cannot be trusted to keep to the originally intended operation of flight paths (i.e most noise directly under the centre of noise corridors (750 m from each edge) with gradual reductions in noise as you move to the edge of the 1500 m wide corridor with less and less noise as you go outside the noise corridors) then the cannot also be trusted with operations resulting from a new runway. Flying 750 m from the centre of a noise corridor produces as much noise for properties 1500 m from the centre as that experienced by a property 750 m from the centre when a plane is using the centre of the corridor. Allowing planes to fly anywhere within a corridor 1500 m wide in effect increases the noise corridor to 3000 m and it is quite clear that cost and efficiency motivations are causing breached on one side of the corridor to a far greater extent than on the other.

19. The CAA’s process for Tier 1a changes is scaled into ‘Levels’, based on the altitude-based priorities in the Government’s Air Navigation Guidance (i.e. where noise impacts are to be prioritised or considered alongside carbon emissions, a more demanding consultation is required). Could the future Tier 2 process also be scaled?

Please select one item
Yes
No
Ticked Don't know

20. Are there any other comments that you would like to make about the CAA’s potential Tier 2 process?

Tier 2 - other comments
No

Tier 3: Other changes to air operations affecting noise impacts

21. To what extent does the draft best practice guidance on Tier 3 changes (other changes that may have a noise impact) meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
How to improve
Wrong starting point

22. Where industry does not follow the CAA’s guidance in respect of Tier 3 changes, or where there is a clear breakdown of trust between an airport and its stakeholders, is it appropriate for the CAA to publicly draw attention to this?

Please select one item
Ticked Yes
No
Don't know
CAA action on Tier 3 further detail
But the CAA itself can only work as authorised by the Department of Transport - Planes should follow a track just as cars and trains follow tracks. Just because the track is in the air does not mean that planes can fly where the wish

23. Considering the list of potential information proposed, would you suggest any additions which would help stakeholders, including communities, understand the impacts of Tier 3 changes and enhance transparency?

Additional information on Tier 3 impacts
Diagram showing a planes flying in the centre of noise corridors with the noise effects radiating outwards towards the edge of noise corridors and beyond Maps showing the centre lines on noise corridors (preferred noise routes) Maps showing the approximate point at which planes are expected to reach specified heights e.g. 4000 m Details of compensation originally made available when Heathrow was built

24. In relation to mitigating the impacts of Tier 3 changes, our draft guidance says that the focus should be on exploring the options for mitigating the change through two-way dialogue, because of the local and often incremental nature of Tier 3 changes. Does the guidance need to give more detail?

Please select one item
Yes
No