Response 335109425

Back to Response listing

About you

A. What is your name?

Name (Required)
James F Sheridan

C. Where do you live?

Please select one item
(Required)
East of England
East Midlands
West Midlands
North East
North West
Northern Ireland
Scotland
Ticked South East
South West
Wales
Yorkshire and the Humber

D. Are you answering this consultation as:

Please select one item
(Required)
Ticked Resident affected by aviation
Airline passenger
Member of the General Aviation community
Member of the commercial aviation industry
Military
Government and / or other regulators
Representative or national organisation or institute
Elected political representative

E. Are you affiliated with any organisation?

Please select one item
Ticked Yes
No
Affiliation
GACC
Please select one item
Yes
Ticked No

F. Is there anything else that you would like us to know about you regarding this consultation?

Please enter any further details
I have serious concerns about the air safety implications of route changes

G. Do you consent for your response to be published?

Please select one item
(Required)
Ticked Yes, with personal identifying information (name, location, respondent category, organisation, additional information - please note your email address will NOT be published if you choose this option)
Yes, anonymised
No

General observations

1. Considering the draft guidance overall, to what extent does it meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion

Tier 1a: Stages 1 to 7

2. Considering Stage 1 (Define) of the process , to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion

3. Considering Stage 2 (Develop and assess) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion

4. Considering Stage 3 (Consult) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion

5. Considering Stage 4 (Update and submit) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion

6. Considering Stage 5 (Decide) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion

7. Considering Stage 6 (Implement) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion

8. Considering Stage 7 (Post-implementation review) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion

Tier 1a: Evidence of engagement

9. At certain stages in the process (starting with the development of design principles at Step 1b) the CAA will look for evidence of a two-way conversation to see that the sponsor has adequately engaged stakeholders. In paragraph C9 the CAA describes the evidence that we will look for as "detail of what sponsors have been told by their audiences; how they responded to this feedback; and how it has affected the proposals they are bringing forward".    Has the CAA adequately detailed what we would expect to see to know that a two-way conversation has taken place?

Please select one item
Yes
Ticked No
Don't know

Tier 1a:Third-party facilitation

10. At various points in the process (starting with the development of design principles at Step 1b) the CAA suggests that voluntary use of a third-party facilitator could be useful. Should the CAA be more prescriptive as to how and when a facilitator could be used?

Please select one item
Ticked Yes
No
Don't know

Tier 1a: Categorisation of responses

12. In paragraphs 177 and C34-C36, and Table C2, we discuss the categorisation of consultation responses. The sponsor is required to sort consultation responses into two categories: i) those responses that have the potential to impact on the proposal because they include new information or ideas that the sponsor believes could lead to an adaptation in a lead design option or a new design option, and ii) those that do not. Is the CAA's explanation of the categorisation exercise and description of the categories sufficient?

Please select one item
Yes
Ticked No
Don't know

Tier 1a: Options appraisal

13. In paragraph E25 and E34 the CAA states that methodologies for the various aspects of the options appraisal should be agreed between the CAA and the sponsor at an early stage in the process, on a case-by-case basis. This provides flexibility for different local circumstances. Does this approach strike the right balance between proportionality and consistency?

Please select one item
Yes
Ticked No
Don't know

Tier 1a: Safety information

14. At each stage in the airspace change process that an options appraisal takes place, the sponsor will be required to submit a safety assessment. The sponsor will be required to provide a plain English summary of the safety assessment and the CAA will provide a plain English summary of its review (i.e. of the Letter of Acceptance, which forms the CAA’s review of the safety assessment) when it makes a decision. These documents will be available on the portal.   Do you have any views on specific information that should be included and/or excluded from the plain English summary of the sponsor’s safety assessment and the CAA’s review? 

Safety assessment
Safety is paramount. CAA has failed to adequately handle the safety implications of the recent flightpath review at Gatwick. The reduction in the ILS joining distance from 10nm to 8nm for landing aircraft from the east is widely flouted with aircraft regularly engaging with the ILS centreline at distances well below 8nm. There is no safety justification for this practice to be allowed and NATS must be taken to task for vectoring landing aircraft at less than 8nm

Tier 1b: Temporary airspace changes

15. Considering Tier 1b changes, to what extent does the draft guidance on temporary airspace changes meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion

Tier 1c: Operational airspace trials

16. Considering Tier 1c changes, to what extent does the draft guidance on operational airspace trials meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion

Tier 1: Spaceflights

17. On 21 February 2017 the Government published the Draft Spaceflight Bill. As the foreword to the draft Bill sets out, “This legislation will see the Department for Transport and the Department for Business, Energy and Industrial Strategy, the UK Space Agency, the Civil Aviation Authority and the Health and Safety Executive working together to regulate and oversee commercial spaceflight operations in the UK.” Do you have any views on whether this process could be used or adapted to suit future airspace change proposals to enable spaceflights, as anticipated in the Draft Spaceflight Bill?

Spaceflight
No

Tier 2: Permanent and planned redistribution

18. The Government proposals talk about a Tier 2 change as one which is likely to alter traffic patterns below 7,000 feet over a populated area and which therefore could have a potential noise impact for those on the ground. The key requirement is that the air navigation service provider must demonstrate that it has assessed the noise impact of the proposed change and engaged with affected communities as appropriate. Which stages of the Tier 1a airspace change process do you think are necessary for a proposal categorised as a Tier 2 change? Please select all those which apply:

Please select all that apply
Ticked Stage 1 Define
Ticked Stage 2 Develop and assess
Ticked Stage 3 Consult
Ticked Stage 4 Update and submit
Ticked Stage 5 Decide
Ticked Stage 6 Implement
Ticked Stage 7 Post-implementation review
None of these
Don’t know
Tier 2 reasons
The implementation of the recent Gatwick review of landings from the east has been badly handled from a safety perspective. The minimum ILS centreline joining distance is widely ignored and with serious safety implications.

19. The CAA’s process for Tier 1a changes is scaled into ‘Levels’, based on the altitude-based priorities in the Government’s Air Navigation Guidance (i.e. where noise impacts are to be prioritised or considered alongside carbon emissions, a more demanding consultation is required). Could the future Tier 2 process also be scaled?

Please select one item
Yes
Ticked No
Don't know

Tier 3: Other changes to air operations affecting noise impacts

21. To what extent does the draft best practice guidance on Tier 3 changes (other changes that may have a noise impact) meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion

22. Where industry does not follow the CAA’s guidance in respect of Tier 3 changes, or where there is a clear breakdown of trust between an airport and its stakeholders, is it appropriate for the CAA to publicly draw attention to this?

Please select one item
Ticked Yes
No
Don't know
CAA action on Tier 3 further detail
Gatwick Airport and NATS should be brought to task for the failure of the 8nm minimum joining distance for the ILS - with the severe safety implications.

24. In relation to mitigating the impacts of Tier 3 changes, our draft guidance says that the focus should be on exploring the options for mitigating the change through two-way dialogue, because of the local and often incremental nature of Tier 3 changes. Does the guidance need to give more detail?

Please select one item
Ticked Yes
No
Don't know