Response 340335557

Back to Response listing

About you

A. What is your name?

Name (Required)
Jane Timmis MBE

C. Where do you live?

Please select one item
(Required)
East of England
East Midlands
West Midlands
North East
North West
Northern Ireland
Scotland
Ticked South East
South West
Wales
Yorkshire and the Humber

D. Are you answering this consultation as:

Please select one item
(Required)
Resident affected by aviation
Airline passenger
Member of the General Aviation community
Member of the commercial aviation industry
Military
Government and / or other regulators
Representative or national organisation or institute
Ticked Elected political representative

E. Are you affiliated with any organisation?

Please select one item
Ticked Yes
No
Affiliation
Dacorum Borough Council
Please select one item
Ticked Yes
No

F. Is there anything else that you would like us to know about you regarding this consultation?

Please enter any further details
I represent communities who are overflown as I am myself

G. Do you consent for your response to be published?

Please select one item
(Required)
Ticked Yes, with personal identifying information (name, location, respondent category, organisation, additional information - please note your email address will NOT be published if you choose this option)
Yes, anonymised
No

General observations

1. Considering the draft guidance overall, to what extent does it meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
How would you improve?
220 plus pages is a lot of information to wade through, so it is likely to exclude full and competent responses from most people other than those who are fully involved or conversant with the industry. As such I would suggest a shortened version with key points for the response of communities and individuals who may have a different understanding and viewpoint from that of those in the aerospace industry. I also found the diagrams of actions very confusing (e.g. page 67)
General observations
Overall this guidance is very much a top down document, with the stakeholders in the form of local residents affected by airport noise and environmental pollution, coming last almost as an afterthought after the decisions are made by the CAA and the Government. I do not feel that those largely influenced detrimentally are considered important in the decision making process. Should not restrict the aircraft above 4000ft as some parts of the land overflown are higher than others and concentrated flights in a narrow band at almost any height increase the noise for those close to the band.

Tier 1a: Stages 1 to 7

2. Considering Stage 1 (Define) of the process , to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
How to improve
Again, more inclusion of stakeholders in the community needed. Should not be treated as secondary to the process. Use of concentration of flights in a narrow band increases the aircraft noise effect rather than by dispersing the aircraft.

3. Considering Stage 2 (Develop and assess) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
How to improve
Better and more representative measures should be used on environmental criteria, especially when involving more than one airport.

4. Considering Stage 3 (Consult) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
How to improve
220 plus pages is a lot of information to wade through, so it is likely to exclude full and competent responses from most people other than those who are fully involved or conversant with the industry, or those who just lose the will to complete it. As such I would suggest a shortened version with key points for the response of communities and individuals who may have a different understanding and viewpoint from that of those in the aerospace industry.

5. Considering Stage 4 (Update and submit) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
How to improve
Needs to explain more clearly how the consultation results would be produced, so that the problems experienced by one group of people are not overlooked/discounted by a larger benefit to other groups. Such as Luton Airport where the benefits accrue to Luton Borough Council (financial) and Bedfordshire communities while Hertfordshire communities suffer the downside of being persistently overflown at a low level.

6. Considering Stage 5 (Decide) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
How to improve
Needs a wider participation , or representatives of stakeholders in the decision making.

7. Considering Stage 6 (Implement) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
How to improve
There is a possibility of 'creep' applications delivered over a period of time which in total could abuse the intention of call-in process.

8. Considering Stage 7 (Post-implementation review) of the process, to what extent does the draft guidance on that stage meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion

Tier 1a: Evidence of engagement

9. At certain stages in the process (starting with the development of design principles at Step 1b) the CAA will look for evidence of a two-way conversation to see that the sponsor has adequately engaged stakeholders. In paragraph C9 the CAA describes the evidence that we will look for as "detail of what sponsors have been told by their audiences; how they responded to this feedback; and how it has affected the proposals they are bringing forward".    Has the CAA adequately detailed what we would expect to see to know that a two-way conversation has taken place?

Please select one item
Yes
Ticked No
Don't know
What else to show two way conversation?
The 'audiences' (or representatives of them) should be able to verify what the Sponsors have said before it is sent to the CAA.

Tier 1a:Third-party facilitation

10. At various points in the process (starting with the development of design principles at Step 1b) the CAA suggests that voluntary use of a third-party facilitator could be useful. Should the CAA be more prescriptive as to how and when a facilitator could be used?

Please select one item
Yes
Ticked No
Don't know

11. Are there any other places in the process at which you feel that a facilitator would be useful?

Facilitator - which places
Right at the start of the process, to ensure that stakeholders understand the process and feel empowered to comment.

Tier 1a: Categorisation of responses

12. In paragraphs 177 and C34-C36, and Table C2, we discuss the categorisation of consultation responses. The sponsor is required to sort consultation responses into two categories: i) those responses that have the potential to impact on the proposal because they include new information or ideas that the sponsor believes could lead to an adaptation in a lead design option or a new design option, and ii) those that do not. Is the CAA's explanation of the categorisation exercise and description of the categories sufficient?

Please select one item
Yes
No
Ticked Don't know

Tier 1a: Options appraisal

13. In paragraph E25 and E34 the CAA states that methodologies for the various aspects of the options appraisal should be agreed between the CAA and the sponsor at an early stage in the process, on a case-by-case basis. This provides flexibility for different local circumstances. Does this approach strike the right balance between proportionality and consistency?

Please select one item
Ticked Yes
No
Don't know
OA - explain re proportionality
So long as it is transparent.

Tier 1a: Safety information

14. At each stage in the airspace change process that an options appraisal takes place, the sponsor will be required to submit a safety assessment. The sponsor will be required to provide a plain English summary of the safety assessment and the CAA will provide a plain English summary of its review (i.e. of the Letter of Acceptance, which forms the CAA’s review of the safety assessment) when it makes a decision. These documents will be available on the portal.   Do you have any views on specific information that should be included and/or excluded from the plain English summary of the sponsor’s safety assessment and the CAA’s review? 

Safety assessment
Please do not use acronyms

Tier 1b: Temporary airspace changes

15. Considering Tier 1b changes, to what extent does the draft guidance on temporary airspace changes meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion

Tier 2: Permanent and planned redistribution

18. The Government proposals talk about a Tier 2 change as one which is likely to alter traffic patterns below 7,000 feet over a populated area and which therefore could have a potential noise impact for those on the ground. The key requirement is that the air navigation service provider must demonstrate that it has assessed the noise impact of the proposed change and engaged with affected communities as appropriate. Which stages of the Tier 1a airspace change process do you think are necessary for a proposal categorised as a Tier 2 change? Please select all those which apply:

Please select all that apply
Ticked Stage 1 Define
Ticked Stage 2 Develop and assess
Ticked Stage 3 Consult
Ticked Stage 4 Update and submit
Ticked Stage 5 Decide
Ticked Stage 6 Implement
Ticked Stage 7 Post-implementation review
None of these
Don’t know
Tier 2 reasons
This the most important issue for most of the people affected by aircraft noise whether it be over a high populated area or a low populated area, so all options need to be considered so that the impact on those being over flown is considered and diluted as far as possible.

19. The CAA’s process for Tier 1a changes is scaled into ‘Levels’, based on the altitude-based priorities in the Government’s Air Navigation Guidance (i.e. where noise impacts are to be prioritised or considered alongside carbon emissions, a more demanding consultation is required). Could the future Tier 2 process also be scaled?

Please select one item
Ticked Yes
No
Don't know

Tier 3: Other changes to air operations affecting noise impacts

21. To what extent does the draft best practice guidance on Tier 3 changes (other changes that may have a noise impact) meet the following criteria?

Comprehensible – it is clear to me what happens
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
Transparent – the activities are explained well and will take place as publicly as possible
Please select one item
1: the guidance is good and meets this criterion 2: the guidance mostly meets this criterion Ticked 3: the guidance does not sufficiently meet this criterion
Proportionate – the guidance strikes the right balance between detail as to what should happen, and flexibility to allow for different local circumstances
Please select one item
1: the guidance is good and meets this criterion Ticked 2: the guidance mostly meets this criterion 3: the guidance does not sufficiently meet this criterion
How to improve
The introduction of PBN technology on a route will lead to a significant concentration of flights, and the change in the noise profile between a widely dispersed swathe and a narrow RNP (sky motorway) is very substantial. Stakeholders will want to be assured that appropriate noise modelling and an environmental impact assessment has been performed. Concentrating the aircraft into narrow RNAV type band causes more complaints from residents than a spread of the same. PBN is a change that needs to be carefully planned.